Dienstag, 15. August 2017

Day 2 at the flume

Time is now ticking as the tide should arrive tonight at approximately 1am. So today we set up the computers and software, making sure everything was responding and time synced.
However, obviously something had to go wrong... the OBS (optical back scatter) decided to not respond and so Peter performed open cable surgery, rewired the cables and replaced the cylinder. After this mayhem the instruments were once AGAIN, measured from the seabed and everything is now ready for water.

Hello from down below! Me, Ian and Paul checking out the wave paddle before the water arrives. 

Keine Kommentare:

Kommentar veröffentlichen