Mittwoch, 13. September 2017

Deconstruction of rigs/Construction of revetment

Today was a sad day...We had to pack all of our equipment away. It has been a long 5 weeks and it certainly felt strange not turning on any of the laptops or instruments!
So, we had two groups of people, one working in the flume dismantling the rigs whilst the others were building the revetment at the top of the beach. All exciting stuff!
By the end of the day, everything was packed in boxes, and the revetment was up and running ready for waves tomorrow. Hopefully we have packed everything correctly and not left anything behind...! (Peter don't worry we definitely do have everything packed cleaned, dried and bubble wrapped! Aaron made sure of that) - if anything happens blame the shipping!
Anyway, everything is done...it is beer o'clock!

Before the destruction began!

All instruments and cables all dismantled,
 ready to be cleaned and packed.

Emily and Jak removing the final instrument, 3D sonar scanner.

And that's it, everything has been packed!


The revetment is in!



Even at home the work continues...Did someone say Matlab?